|
Powered by
Nord Stream considers more pipelines
Mon, 14 May 2012
Nord Stream AG will conduct a feasibility study of possible options to further increase the capacities to transport natural gas from Russia to the European Union through the Baltic Sea.
Offshore contract awarded for Chinese development project
Fri, 11 May 2012
Offshore Oil Engineering Co. has awarded Technip a pipeline installation contract for the Liwan 3-1 shallow water gas project, located approximately 300 km south of Hong Kong in the Pearl River Mouth Basin, offshore China.
UK pipeline prepares for emergencies
Wed, 2 May 2012
BBL Company has awarded Independent Risk Management Systems a contract to produce a concept proposal that will provide a thorough assessment of BBL’s current pipeline repair contingency plans and preparedness.
Interview: TAP and Shah Deniz on the Southern Gas Corridor
Tue, 1 May 2012
Trans Adriatic Pipeline AG Managing Director Kjetil Tungland and BP Vice President for the Shah Deniz Development Al Cook have shared their thoughts on why the Southern Gas Corridor is important and the contrasting challenges they face in delivering different parts of the multi-billion dollar project in an interview.
Second Nord Stream line completed ahead of schedule
Fri, 27 April 2012
Nord Stream has completed offshore pipelay for the second of its twin 1,224 km gas pipelines through the Baltic Sea ahead of schedule.
Loan to fund Ghanaian gas pipelines
Fri, 27 April 2012
A portion of the $US3 billion loan Ghana recently secured from the Chinese Development Bank will be allocated to the development of the Jubilee Oil Field, which will involve both onshore and offshore gas pipelines.
Detailed design contract awarded for GSA Development
Tue, 24 April 2012
The offshore business stream of the Penspen Group, Andrew Palmer and Associates, has been contracted by EPC Offshore to provide detailed design services for the Greater Stella Area Development, located in the central North Sea.
Qatar sees successful pipeline pressure isolation
Emergency pipeline repair service offers advance preparation
Wed, 4 April 2012
Global joint integrity specialist Hydratight has launched an updated emergency pipeline repair system to offer better disaster planning and contingency services to operators and contractors in the oil and gas industry.
World’s largest SmartPlug pipeline pressure isolation tool completed
Tue, 27 March 2012
Product and services provider TDW Offshore Services has completed the design and construction of a 48 inch diameter, 12 t SmartPlug pipeline pressure isolation tool for the Nord Stream natural gas pipeline, located in the Baltic Sea in Germany.
Next Page