The project scope includes engineering, supply, installation and pre-commissioning of the 11 km flexible pipeline system that will connect two production wells to the Casablanca platform.
Technip will also install a pumping manifold, umbilicals and flying leads provided by the client.
As the project is located in a fishing area the flexible pipelines and umbilicals will be trenched to protect fishing lines.
All flexible pipelines will be fabricated at Technip’s plant in Le Trait, France.
Article continues below…Offshore installation is scheduled to be carried out in the first half of 2011, using the Deep Constructor, one of Technip's deepwater construction vessels.









